What a home renovation really costs in Calgary
Get a written estimate
Why nobody can price your renovation from a photo
Five things that set the price
- The size of the space and how much is being changed
- What is behind the walls, floors and ceilings
- The materials and fixtures you choose
- How many trades are involved and for how long
- Permits, inspections and engineering where needed
- Timing, access and how occupied the house is
What moves the number on each job
Six steps to a number you can trust
Walk the house
Measure and photograph
Agree the scope
Price by trade and material
Set allowances honestly
Review it with you
Permit costs belong in the estimate
Costs that are specific to this city
- Frost depth and soil conditions that affect footings
- Winter scheduling for concrete, roofing and exterior work
- Hail-rated exterior materials in neighbourhoods that get hit often
- Older wiring and plumbing in 1960s and 70s homes
- Dust and disruption control when you live in the house
- Waste disposal and bin fees at current rates
The money you set aside for what you can’t see yet
A clean estimate shows
- Labour, materials and permits as separate lines
- Which items are allowances and how much
- What is not included, written out
- How change orders will be handled
- A payment schedule tied to progress
- A start window and expected finish
Ways to lower the cost without cutting corners
Where to spend and where to save
- Spend on waterproofing, wiring and structure
- Spend on windows and insulation
- Save by keeping plumbing in place
- Save by choosing standard sizes
- Save on easy-to-change finishes like paint and hardware
- Be flexible on timing where you can
We price jobs across Calgary
SW Calgary
Elbow ParkMount RoyalAspen WoodsAltadorePump Hill
What a good estimate includes
- A written scope of work, room by room
- Labour and materials priced separately
- Permit and inspection costs on their own line
- Allowances marked clearly with amounts
- Exclusions written out, such as furniture moving or painting
- A schedule with a start window and a finish target
Be careful if you see
- A price given without a site visit
- A big deposit before any work or materials
- No mention of permits for work that needs them
- Vague wording like “supply and install as needed”
- Allowances far below normal prices
- Pressure to sign today
Questions homeowners ask
It depends on cabinets, countertops, appliances, layout changes and what the walls and floors hide. A small refresh and a full gut with new plumbing and wiring sit very far apart. We give a written number after a site visit. See our kitchen renovation page for what we look at.
Waterproofing, tile and the shower or tub drive most of it, and small rooms still need every trade. Moving plumbing adds cost. Our bathroom renovation page covers the details.
We offer a free consultation and site visit, then provide a written scope and estimate. If you want drawings or engineering before pricing, we’ll tell you what that involves and what it costs first.
Our estimates are based on a written scope. If the scope is clear and nothing unexpected turns up, the price holds. If something hidden appears, or you ask for changes, we write a change order and agree it with you before proceeding.
Many homeowners set aside ten to fifteen per cent as a reserve, more for older houses. It’s your money, and you keep whatever isn’t used.
Usually because they’re pricing different things. One may include permits, a proper allowance and cleanup, and another may not. Compare scopes line by line, not totals.
We state clearly whether a figure includes GST. In Alberta there is no provincial sales tax, but five per cent GST applies to renovation work.
Sometimes, yes, such as painting or demolition prep, if it’s agreed in writing so the schedule and warranty are clear. Electrical, plumbing and structural work should stay with licensed trades.